Configure target utilization
Target utilization tells the AI Employee Scheduler how busy your providers should be when building a suggested schedule. By raising or lowering this value per job, you control the buffer built into staffing targets — balancing provider workload against coverage for walk-ins, no-shows, and forecast variance.
Availability: AI Employee Scheduler is in Beta. Your center is enrolled automatically by Zenoti; no self-enrollment step is required.
Note: For conceptual background on how the AI Employee Scheduler works, see AI Employee Scheduler overview.
Before you begin
- Your center must be enrolled in the AI Employee Scheduler Beta.
- You must have access to the Demand based Scheduling page (toolbar button: AI Scheduling).
- A suggested schedule for the current week must already exist. If no schedule has been generated, run an initial generation before adjusting utilization targets.
Steps
Open the Utilization targets list
- From the Zenoti toolbar, select AI Scheduling. The Demand based Scheduling page opens and displays the Schedule Grid.
- In the Schedule Grid rail on the right side of the page, locate the Utilization targets section.
The Utilization targets list shows one row per job with the current target value for that job. The default value for each job is 80%.
Set a target for a single job
In the Utilization targets list, find the row for the job you want to adjust.
Use the stepper control on that row to select a value between 50% and 100%.
- A lower value (closer to 50%) builds a larger operating buffer into the staffing target, scheduling more providers than the base demand forecast requires.
- A higher value (closer to 100%) reduces the buffer, scheduling fewer additional providers beyond the base forecast.
After you change the value, the schedule header displays Settings changed - regenerate to apply.
Set the same target for all jobs at once
- In the Utilization targets section of the rail, select Set all to....
- Choose the target percentage to apply to every job. The stepper on every job row updates to the selected value.
- The schedule header displays Settings changed - regenerate to apply.
Note: When jobs have different target values, the rail displays Mixed in place of a single percentage summary. After you use Set all to..., the Mixed indicator clears and all rows show the selected value.
Override a job's target for one employee
An individual employee's target can differ from the job-level default by configuring a scheduling rule for that employee.
- In the Schedule Grid, select the employee row you want to configure.
- Open the Scheduling rules drawer for that employee.
- Set the target utilization override for the relevant job. This value applies only to that employee and overrides the job-level target when the schedule is generated.
- The schedule header displays Settings changed - regenerate to apply.
Apply changes by regenerating the schedule
After adjusting any target or scheduling rule, you must regenerate the schedule for the new settings to take effect.
Review your updated targets in the Utilization targets list.
Select Regenerate.
Important: Regenerating replaces this week's suggested schedule and clears any edits you have made that have not yet been copied into Zenoti. Confirm that no pending edits need to be preserved before you proceed.
The system rebuilds the week's suggested schedule using the updated targets.
How staffing targets are calculated:
- For each time slot, the system divides the predicted demand by the target utilization value, then rounds the result to the nearest whole person. The result never falls below the slot's raw predicted demand.
- For example, if predicted demand for a slot is 4 providers and target utilization is 80%, the staffing target is 4 ÷ 0.80 = 5 providers (rounded to the nearest whole person).
- The difference between the staffing target and raw demand is the built-in buffer for walk-ins, no-shows, and forecast variance.
- The default rounding mode is nearest (round-half-up). This replaces the prior behavior, which always rounded up to the next whole person (ceiling rounding).
When hard constraints or the available pool of eligible providers prevent the system from reaching the staffing target on a given day, the shortfall appears in the day-level coverage summary for that day rather than being silently absorbed.
Discard pending setting changes
If you want to revert uncommitted target changes before regenerating:
- While the schedule header displays Settings changed - regenerate to apply, select Discard changes.
- The targets and scheduling rules return to their last saved state and the header indicator clears.
Worked example: A center has two jobs — Therapist and Nail Tech. Therapist demand on Saturday is predicted at 6. With the default 80% target, the staffing target is 6 ÷ 0.80 = 7.5, rounded to 8 providers (nearest, round-half-up). The manager wants a tighter buffer for Nail Techs on quieter days and sets their target to 90%. With predicted demand of 3, the Nail Tech staffing target becomes 3 ÷ 0.90 = 3.3, rounded to 4 providers. The Therapist row still shows 80%, so the rail displays Mixed. The manager selects Regenerate and the updated targets take effect.
Tips
- Use Set all to... at the start of a new season to quickly reset all jobs to a baseline, then fine-tune individual jobs from there.
- Set a lower target (50%–70%) for high-demand days or peak seasons where walk-in volume is typically high. Set a higher target (85%–100%) for predictable, appointment-heavy days where the forecast is reliable.
- When a day-level coverage summary shows a staffing shortfall after regeneration, check whether hard constraints (such as maximum working hours or provider availability) are limiting the eligible pool. Adjusting the target alone will not resolve a shortfall caused by too few available providers.
- Use per-employee scheduling rule overrides sparingly. Applying overrides to many employees makes it harder to see the effect of job-level target changes across the schedule.
- Select Discard changes any time you want to experiment with target values without committing — the setting reverts cleanly until you choose Regenerate.
Troubleshooting
The Utilization targets section is not visible in the rail. The Schedule Grid rail may not be fully expanded, or no suggested schedule exists for the current week. Confirm that a schedule has been generated. If the page shows only an empty grid, initiate schedule generation first, then return to the rail to adjust targets.
After regeneration, the day-level coverage summary still shows a staffing shortfall. This indicates that hard constraints or the size of the eligible provider pool prevented the system from reaching the staffing target. Lowering the target utilization value will not resolve the shortfall if there are not enough available providers. Review provider availability and scheduling rules for the affected day, then regenerate.
The Mixed indicator does not clear after using Set all to... Confirm that you selected a value from the Set all to... control and that all job rows updated. If a per-employee scheduling rule override is in place for a job, that override does not affect the job-level target display — the Mixed indicator reflects job-level differences only.
Regenerate replaces edits I had not copied to Zenoti. Changes made directly to the suggested schedule (such as manual edits) are cleared when you regenerate. Before regenerating after target changes, use Copy all to preserve any approved edits in Zenoti, or note the edits to re-apply after regeneration.
Discard changes did not revert my targets. Discard changes reverts targets to the last saved state — that is, the state from the most recent Regenerate action. If you regenerated after making some target changes and then made further changes, Discard changes reverts only to the post-regeneration state, not to the original defaults.